CAD design in 24 to 48 hours
Designs for your production: ready for milling or printing, according to your parameters.
Who the CAD service is for
Practices with in-house technicians
You manufacture yourself but need CAD designs? You receive files ready for milling or printing according to your machine parameters.
Dental laboratories
Expand your service range with external CAD design. Fast, precise, according to your specifications.
Practices with milling machine / 3D printing
Ready for production: you receive the design and mill or print it yourself. No detours, no delays.

Designs ready to mill or print
- Designs for 3D printing and milling
- Additive or subtractive manufacturing: you receive the right file.
- Monoblock or modular design
- Depending on requirements: compact or modular construction.
- Individual parameters per material
- Every material has its own requirements. They are taken into account in every design.
- Complete removable dentures
- Complete full dentures, digitally designed.
- Crowns, bridges, abutments, splints
- The full range of digital design.
Smile design: making aesthetics predictable
Digital smile design planning for predictable, aesthetically safe results. Visualize the outcome before treatment begins.

Predictable results
Digital preview of the final result: patient and dentist see in advance how the smile will look.
Precise planning
Every tooth shape, size and position is digitally planned. No guessing, only controlled aesthetics.
Better communication
The smile design is a shared visual language for dentist and patient.

CAD design for dental labs
External CAD capacity for your lab. Flexible, fast and without extra staff.
- Outsource CAD design during capacity bottlenecks
- Relieve internal resources
- Scale without additional personnel
- Free test design to get started

Free test design for your first order
Modelling of up to 5 teeth. Judge quality, style and file format before you pay anything.
Conditions & workflow
Requirements
- Machine parameters
- For each material we need your machine parameters (screenshots or table). Without these, no order starts.
- Fixed occlusion
- A fixed occlusion is mandatory. Without it, no order can start.
- Order hours
- Orders are accepted Monday to Friday between 9 am and 7 pm.
Service
- Accuracy of fit
- If a design is inaccurate despite correct scans, it is corrected free of charge.
- Scan check
- On request, you get quick feedback on whether the scan is usable while the patient is still in the chair.
- Complex cases
- For complex cases, the dentist or technician receives a professional assessment in advance.
- Express under 24 hours
- For urgent cases: express service under 24 hours with a 30 % surcharge per unit.
Try the CAD service on one case.
Send your scan and machine parameters by email and receive a file ready to mill or print.

